Using the roadmap feature
=========================
Pagure allows building the roadmap of the project using the tickets and
their milestones.
The principal is as follow:
* For each milestones defined in the settings of the project, the roadmap
will group tickets with the corresponding milestone.
* If your project has an ``unplanned`` milestone, this milestone will be
shown at the bottom of the roadmap page. This allowing you to put something
on the roadmap without assigning a real milestone to it.
Example
-------
For a project named ``test`` on ``pagure.io``.
* First, go to the settings page of the project, create the milestones you
like, for example: ``v1.0`` and ``v2.0``.
* For the tickets you want to be on these milestones, go through each of them
and set their milestone to either ``v1.0`` or ``v2.0``, or none of them
if the ticket is not on the roadmap.
You can set the milestone on the metadata panel on the right side of the
issue page.
* And this is how it will look like
.. image:: _static/pagure_roadmap2.png
:target: ../_images/pagure_roadmap2.png